Index › Page 49 — Article VI §2: Submission Requirements

constructed and that are generally architecturally compatible with the environment and harmonious with each other within the development. To that end and to ensure compliance with the requirements of Article V of this Declaration, there is hereby established the Architectural Approval Committee ("Committee") for SHELTER LAKES.

Section 2.   Submission Requirements.

Approval of all site plans, specifications, plats and external designs of any improvements pursuant to Article V to be erected, built or altered upon any of the Lots in the subdivision must be obtained from the Committee and no clearing, grading or construction may be commenced until such approval has been obtained as provided herein. All submissions to the Committee shall be made to it at Route 2, Box 985, Catlett, Virginia 22019. Submissions for approval of a residence and related structures shall include as a minimum:

a)   Architectural drawings which shall include floor plans, all exterior elevations, at least two wall sections and specifications for exterior walls, stamped by an architect or professional engineer licensed to do business in Virginia.

b)   Site plan which shall show the house, drainfield, fencing, driveways, garage, recreational improvements (if any), property boundaries, and limits of clearing and grading;

c)   Building material samples which shall include a sample of the roof tile, exterior trim, brick and/or siding;

d)   Color scheme for the exterior, including paint samples;

e)   Landscape plan;

f)   Bonded Improvements Agreement in the form attached hereto as Schedule "A" duly executed by Owner with payment to Raymond C. Hawkins Construction Co., Inc., of $750.00 per driveway entrance as a bonded improvements escrow to be held pending final acceptance of the bonded public improvements; and

g)   Builder's Agreement duly executed by Owner and his Builder in the form attached hereto as Schedule "B".

Original scan of page 49
‹ Page 48 Page 50 ›