Architectural Approval

What needs review, how the AAC process works, and the current submittal form.

Overview

Article VI of the Declaration requires the Association to maintain an Architectural Approval Committee (AAC) to review exterior projects before they’re built. The AAC’s stated purpose is to protect the curb appeal and property values that come with Shelter Lakes’ larger lots and visual privacy — and to consider any project that could affect a neighbor, even one that isn’t visible from the road.

Homeowners are also asked to maintain their properties, remove unsightly or excessive lawn furniture or vehicles, and screen sheds or outbuildings visible from the road — simple upkeep the AAC guidelines call out as part of keeping the community appealing to residents and visitors alike.
Declaration — Article VI; Article VI section

What Needs Approval

In general, the AAC must review any significant exterior modification, color change, improvement, or addition — including landscaping, patios, and decks — that could be seen from the road by a passing motorist or walker, or seen or heard by a neighbor. That covers things like:

Interior renovations that don’t affect the exterior generally do not require approval.

How the AAC Works

The AAC is composed of three members who review applications and decide by majority vote. If the committee seat is vacant, the Shelter Lakes Board of Directors acts as the AAC.

Neighbor Sign-Off

For projects that could have a serious visual or noise impact on adjacent neighbors — a basketball court, play yard, swimming pool, tree clearing, fencing, and similar projects — the submittal form has space for up to three neighbors to sign indicating their approval. This isn’t a veto; it’s documentation the AAC can weigh alongside the rest of the application.

How to Submit

  1. Describe the planned improvement in detail — materials, colors, dimensions — or attach architectural plans and specifications.
  2. If neighbors could be visually or audibly affected, ask them to sign the neighbor sign-off section.
  3. Submit the completed form by email, hand delivery, or mail (see below), and wait for written approval before starting work.
Hand Deliver
To any Shelter Lakes HOA Board member
Mail
Shelter Lakes HOA
PO Box 12
Catharpin, VA 20143

Download the Form

📄
Shelter Lakes AAC Submittal & Approval Form
PDF · includes AAC policies, guidelines, and the submittal form
Download PDF
Shelter Lakes Board of Directors — AAC Regulations and Guidelines (original 3/6/03)